| 1. | Hydraulic fill dams are built of sand and silt brought into the dam in a stream of water, usually through a pipe . 水力冲填坝通常是用一根管子利用水流把砂和粉沙运到坝体处筑坝。 |
| 2. | A small leakage through an earth fill or hydraulic fill dam or its foundation removes some fine material in suspension . 贯穿填土坝、水力冲填坝或坝基的一个细小的漏水孔隙以悬浮的方式带走一些细小的土粒。 |
| 3. | Solutions to the problem of leakage in the rock - filled dam 土石坝坝体的渗漏处理 |
| 4. | Test and research on asphalt concrete core of rock fill dam 沥青混凝土防渗墙施工技术 |
| 5. | Real - time dynamic simulation system of rock - fill dams 堆石坝施工的实时动态仿真系统研究 |
| 6. | Study on distributing state of lenticle in tailings fill dam 尾矿堆积坝透镜体分布状态研究 |
| 7. | Design code for rolled earth - rock fill dams 碾压式土石坝设计规范 |
| 8. | Applying placement asphalt concrete core wall in rock - filled dam 浇筑式沥青混凝土心墙在堆石坝上的应用 |
| 9. | Discussion about construction quality supervision of the rolled rock - fill dam 浅谈堆石碾压坝的施工质量监理 |
| 10. | Stress analysis of the rock fill dam with asphaltic concrete core wall 冶勒堆石坝沥青混凝土心墙型式及尺寸研究 |